Compact module

A30 Ultra

Two stacked modules with an external staircase and upper landing.

Choose a version

Narrow Standard, wider single-level Pro or stacked Ultra: compare width and the arrangement of levels.

Stated area
≈ 25 m²
Levels
2
Terrace shown
External landing shown
Nominal dimensions
5.8 × 2.15 × 5 m

Estimated total area of both modules, excluding stairs and landing. Usable internal area to be specified in the quote.

Request a tailored quote

The layout, in detail

Layout of one module: sleeping area on the right, bathroom and kitchen on the left.

Sleeping area

The bed occupies the right side of the illustrated module, near the side glazing.

Bathroom

At upper left, an enclosed compartment contains a shower, WC and basin.

Kitchen and entrance

A linear kitchen is drawn along the bathroom partition. The entrance is at lower left.

Upper-level access

An external staircase leads to the upper module’s landing.

Structure and envelope

  • Rounded shell and glazed front shown in the model views.

Equipment

Interior illustration of one module.
  • Kitchen shown in the plan.
  • Bathroom fittings: models and supply to be confirmed.

Only equipment, furniture and outdoor works listed in the quote are included. The quote also specifies materials, finishes, capacities and regulatory adaptations.

Options to explore

Selected options will be included in your enquiry. Compatibility, pricing and supply are confirmed in the quote.

Installation requirements

Indicative mass
8 t

Indicative weight, to be confirmed for your configuration and transport.

  1. 01

    Planning and permissions

    Check permitted use, permissions and local requirements with the municipality; modular construction does not automatically remove permission requirements.

  2. 02

    Ground and foundations

    Plan ground assessment, foundations or supports, anchoring and drainage suited to the site and loads.

  3. 03

    Delivery and lifting

    Assess the delivery route, clearances, crane access and lifting area before quoting transport.

  4. 04

    Utility connections

    Allow for electricity, water supply, wastewater and winter protection; site works are quoted separately.

  5. 05

    Upper-level assembly

    For two levels: validate assembly, stability, stairs, guardrails and escape routes.

  6. 06

    Lead time and warranties

    Lead time, availability, warranties, transport, lifting and installation are set out in the contractual offer.

A30 Ultra

Plan my project

Tell us the location and intended use to receive a tailored proposal.

Request a tailored quote