Your project, step by step
From the first idea to handover.
Choose a home, review the site and agree the scope. Kalencia remains your point of contact as your project moves towards installation.

01Choose your home
A layout that fits the way you live.
A place to live, host guests or work: your intended use guides the choice of model and version.
- Your needs
- The spaces you need, privacy, storage and the people you want to accommodate.
- The model to explore
- The layout, dimensions, equipment and options of the chosen version.
The next stepAn initial choice of home and the details to work through together.
Indicative layout. Internal dimensions and equipment are confirmed before ordering.
Explore the K7002Review your site
The right home, in the right place.
Before you commit, we review what your site allows and what needs to be prepared.
The next stepSite constraints and the requirements to check before the project is agreed.
Access and lifting
Truck route, narrow points, turns and crane position.
Position and foundations
Position, slope, ground conditions and suitable supports.
Utility connections
Power, water and drainage to arrange on site.
Use and local requirements
Requirements for the address and intended use.
Confirm required approvals with the relevant authority before committing.
03Agree the quote
Know what’s included. And who does what.
Your quote connects the chosen home with the conditions on your site. It separates the configuration, selected options and work required.
The next stepA written scope covering included work, the parties involved and your own responsibilities.
- The home
- Confirmed model, version, materials and equipment.
- Your options
- Additional fit-out choices selected for this version.
- Delivery and site work
- Transport, crane, foundations, connections and installation within the agreed scope.
04–07Bring it to life
From production to your site.
After the agreement, Kalencia follows your order and coordinates the parties involved within the agreed scope.

Follow production
The manufacturing partner builds the home. Kalencia places the order and follows its progress.
Prepare delivery
Transport, unloading and lifting are arranged around site access and conditions.
Install and connect
Preparation of supports, placement and utility connections are coordinated according to the agreed responsibilities.
Check and hand over
The home is checked with you before handover. Support and warranties follow your agreement.
The first conversation
Where is your project today?
You can start with an idea. A few details help us prepare the next steps.
Helpful to get started
- Intended use and the spaces you need
- Country, town and where you are in your site search
- A model you like, if you have one in mind