Lower level
An open module combines a central sleeping area with a lounge on the right. On the left, the basin, WC and shower sit near the entrance.

Compact module
Two stacked modules with sanitary facilities on each level and upper access by an external staircase.
Total reference area across two levels, not a certified habitable area.
An open module combines a central sleeping area with a lounge on the right. On the left, the basin, WC and shower sit near the entrance.
The second plan repeats the same arrangement: sanitary spaces on the left, bed in the centre, sofa and coffee table on the right.
External stairs lead to the upper landing and terrace. Their position remains to be confirmed.
Two A50 Ultra views showing stacked and offset modules, the external staircase, terrace and supports.
Only equipment, furniture and outdoor works listed in the quote are included. The quote also specifies materials, finishes, capacities and regulatory adaptations.
Check permitted use, permissions and local requirements with the municipality; modular construction does not automatically remove permission requirements.
Plan ground assessment, foundations or supports, anchoring and drainage suited to the site and loads.
Assess the delivery route, clearances, crane access and lifting area before quoting transport.
Allow for electricity, water supply, wastewater and winter protection; site works are quoted separately.
For two levels: validate assembly, stability, stairs, guardrails and escape routes.
Lead time, availability, warranties, transport, lifting and installation are set out in the contractual offer.
A50 Ultra
Tell us the location and intended use to receive a tailored proposal.