Compact module

A50 Ultra

Two stacked modules with sanitary facilities on each level and upper access by an external staircase.

Choose a version

Single-level Standard or two-level Ultra with an external staircase and upper terrace.

Stated area
36.55 m²
Levels
2
Terrace shown
Yes
Nominal dimensions
Length × width: 8.5 × 2.15 m

Total reference area across two levels, not a certified habitable area.

Request a tailored quote

The layout, in detail

Two levels with the same illustrated layout. Internal dimensions and fit-out to be confirmed.

Lower level

An open module combines a central sleeping area with a lounge on the right. On the left, the basin, WC and shower sit near the entrance.

Upper level

The second plan repeats the same arrangement: sanitary spaces on the left, bed in the centre, sofa and coffee table on the right.

External access

External stairs lead to the upper landing and terrace. Their position remains to be confirmed.

Model view

Structure and envelope

  • Steel frame and aluminium exterior cladding.
  • Polyurethane insulation; thermal performance must be checked against the climate and project requirements.
  • Specified double glazing 6 + 12A + 6; aluminium doors and windows.
  • Bamboo-charcoal fibre and aluminium interior panels, with water-resistant composite flooring.

Equipment

  • Interior and exterior lighting, electric curtains and sockets described in the configuration.
  • Smart controls and access control: functions and integration to be agreed.
  • Central air conditioning, water heating and bathroom heating: capacity and number of units to be agreed.
  • Shower, smart WC, basin and taps, subject to the selected configuration.

Only equipment, furniture and outdoor works listed in the quote are included. The quote also specifies materials, finishes, capacities and regulatory adaptations.

Options to explore

Selected options will be included in your enquiry. Compatibility, pricing and supply are confirmed in the quote.

Installation requirements

  1. 01

    Planning and permissions

    Check permitted use, permissions and local requirements with the municipality; modular construction does not automatically remove permission requirements.

  2. 02

    Ground and foundations

    Plan ground assessment, foundations or supports, anchoring and drainage suited to the site and loads.

  3. 03

    Delivery and lifting

    Assess the delivery route, clearances, crane access and lifting area before quoting transport.

  4. 04

    Utility connections

    Allow for electricity, water supply, wastewater and winter protection; site works are quoted separately.

  5. 05

    Upper-level assembly

    For two levels: validate assembly, stability, stairs, guardrails and escape routes.

  6. 06

    Lead time and warranties

    Lead time, availability, warranties, transport, lifting and installation are set out in the contractual offer.

A50 Ultra

Plan my project

Tell us the location and intended use to receive a tailored proposal.

Request a tailored quote