Extended capsule

K70 Ultra

Two levels with sanitary facilities on each, a bedroom in the upper module and an upper terrace reached by an external staircase.

Choose a version

Standard with a terrace, K70s without an integrated terrace or two-level Ultra: three distinct arrangements.

Stated area
54.7 m²
Levels
2
Terrace shown
Yes
Nominal dimensions
11.5 × 3.3 × 6.4 m

Total reference area across two levels, not a certified habitable area.

Request a tailored quote

The layout, in detail

01: lower level, shown above. 02: upper module, shown below. Internal dimensions, fit-out and sleeping capacity to be confirmed.

Lower level

Lounge, central bathroom and sleeping space in the main module.

Upper module

An additional bedroom and separate sanitary space.

Roof terrace

An open terrace with guardrails, accessed by an external staircase.

Model view

Structure and envelope

  • Steel frame and aluminium exterior cladding.
  • Polyurethane insulation; thermal performance must be checked against the climate and project requirements.
  • Specified double glazing 6 + 12A + 6; aluminium doors and windows.

Interior finishes

Aluminium or bamboo-charcoal fibreboard composite wall panels. Water-resistant composite flooring and a large skylight.

Equipment

Lighting and controls

  • Indoor and outdoor LED lighting, with warm tones and variable colours.
  • Electric curtains, smart controls, sockets and access control.

Bathroom

  • Glass sliding door, shower, smart WC, basin and taps.

Climate comfort

  • Air conditioning and a water heater.
  • 3-in-1 bathroom heater.

Only equipment, furniture and outdoor works listed in the quote are included. The quote also specifies materials, finishes, capacities and regulatory adaptations.

Options to explore

Selected options will be included in your enquiry. Compatibility, pricing and supply are confirmed in the quote.

Installation requirements

  1. 01

    Planning and permissions

    Check permitted use, permissions and local requirements with the municipality; modular construction does not automatically remove permission requirements.

  2. 02

    Ground and foundations

    Plan ground assessment, foundations or supports, anchoring and drainage suited to the site and loads.

  3. 03

    Delivery and lifting

    Assess the delivery route, clearances, crane access and lifting area before quoting transport. The project documentation identifies components delivered assembled and those assembled on site.

  4. 04

    Utility connections

    Allow for electricity, water supply, wastewater and winter protection; site works are quoted separately.

  5. 05

    Upper-level assembly

    For two levels: validate assembly, stability, stairs, guardrails and escape routes.

  6. 06

    Lead time and warranties

    Lead time, availability, warranties, transport, lifting and installation are set out in the contractual offer.

K70 Ultra

Plan my project

Tell us the location and intended use to receive a tailored proposal.

Request a tailored quote