Extended capsule with an angled façade

X70s

The same exterior dimensions as the X70, without an integrated terrace: the plan redistributes enclosed space between living, sleeping and an unfurnished zone.

Choose a version

Two versions with the same exterior dimensions: X70 with a terrace, X70s with a different interior arrangement and no integrated terrace.

Stated area
38 m²
Levels
1
Terrace shown
Not shown
Nominal dimensions
11.5 × 3.3 × 3.3 m

Reference area, not a certified habitable area.

Request a tailored quote

Example of a garden setting. Illustrative view.

The layout, in detail

The open space on the right remains to be fitted out. Internal dimensions and equipment to be confirmed before ordering.

Lounge by the entrance

At lower left, a sofa and coffee table occupy the glazed end. The side entrance is nearby.

Corner kitchen

At upper left, the plan shows a corner kitchen with a sink and hob.

Central bathroom

In the centre, a shower zone adjoins a compartment with WC and basin, accessed from the passage.

Open sleeping area

To the right of the bathroom, the bed sits against a partial partition. The passage stays open, and the right-hand part of the plan shows no other furniture.

Model view

Structure and envelope

  • Rounded shell and glazed front shown in the model views.

Equipment

  • Kitchen shown in the plan.
  • Bathroom fittings: models and supply to be confirmed.

Only equipment, furniture and outdoor works listed in the quote are included. The quote also specifies materials, finishes, capacities and regulatory adaptations.

Installation requirements

Indicative mass
9.5 t

Indicative weight, to be confirmed for your configuration and transport.

  1. 01

    Planning and permissions

    Check permitted use, permissions and local requirements with the municipality; modular construction does not automatically remove permission requirements.

  2. 02

    Ground and foundations

    Plan ground assessment, foundations or supports, anchoring and drainage suited to the site and loads.

  3. 03

    Delivery and lifting

    Assess the delivery route, clearances, crane access and lifting area before quoting transport.

  4. 04

    Utility connections

    Allow for electricity, water supply, wastewater and winter protection; site works are quoted separately.

  5. 05

    Lead time and warranties

    Lead time, availability, warranties, transport, lifting and installation are set out in the contractual offer.

X70s

Plan my project

Tell us the location and intended use to receive a tailored proposal.

Request a tailored quote