Two-level A-frame

R30

An A-frame whose internal spiral staircase connects the lower lounge to the upper sleeping space.

Stated area
36 m²
Levels
2
Terrace shown
Not shown
Nominal dimensions
5.55 × 4 × 5 m

Total reference area across two levels, not a certified habitable area.

Request a tailored quote

Illustrative visualization. The outdoor platform and railings are site features to assess separately.

The layout, in detail

Top plan: lower level. Bottom plan: upper level. Internal dimensions, usable roof clearance and fit-out to be confirmed.

Lower-level lounge

In the top plan, the entrance on the left opens into a lounge with a sofa and coffee table.

Ground-floor sanitary spaces

At upper right in the top plan, the shower, WC and basin are grouped along the wall.

Internal staircase

On the right of both plans, a spiral staircase connects the levels.

Upper-level sleeping area

The bottom plan shows a bed on the left and the stair arrival on the right, beneath the sloping roof.

Model view

Structure and envelope

  • Steel frame and aluminium exterior cladding.
  • Polyurethane insulation; thermal performance must be checked against the climate and project requirements.
  • Specified double glazing 6 + 12A + 6; aluminium doors and windows.

Equipment

  • Composite or aluminium interior panels, water-resistant composite flooring and ambient LED lighting.
  • Smart controls, electric curtains, sockets and access control described in the configuration.
  • Air conditioning and water heating: capacity and number of units to be agreed for the project.
  • Basin and taps, WC and shower according to the selected sanitary layout.

Only equipment, furniture and outdoor works listed in the quote are included. The quote also specifies materials, finishes, capacities and regulatory adaptations.

Options to explore

Selected options will be included in your enquiry. Compatibility, pricing and supply are confirmed in the quote.

Installation requirements

  1. 01

    Planning and permissions

    Check permitted use, permissions and local requirements with the municipality; modular construction does not automatically remove permission requirements.

  2. 02

    Ground and foundations

    Plan ground assessment, foundations or supports, anchoring and drainage suited to the site and loads.

  3. 03

    Delivery and lifting

    Assess the delivery route, clearances, crane access and lifting area before quoting transport.

  4. 04

    Utility connections

    Allow for electricity, water supply, wastewater and winter protection; site works are quoted separately.

  5. 05

    Upper-level assembly

    For two levels: validate assembly, stability, stairs, guardrails and escape routes.

  6. 06

    Lead time and warranties

    Lead time, availability, warranties, transport, lifting and installation are set out in the contractual offer.

R30

Plan my project

Tell us the location and intended use to receive a tailored proposal.