An open sleeping area
On the left, the bed occupies the glazed end of the module, open to the central passage.

Modular studio
A studio with a sleeping area, small workspace, kitchenette and bathroom.
Reference area, not a certified habitable area.
Placement example with two modules. Specifications refer to one S40; the second module and platform are not assumed to be included.
On the left, the bed occupies the glazed end of the module, open to the central passage.
At lower centre, the plan shows a desk with a seat and storage between the bed and bathroom.
At lower right, an enclosed room contains a WC, basin and corner shower.
At upper right, a counter with sink and hob faces the bathroom. The entrance is at the right end.
Two S40 views: glazed façade above and enclosed façade with a ventilation grille below.
Only equipment, furniture and outdoor works listed in the quote are included. The quote also specifies materials, finishes, capacities and regulatory adaptations.
Check permitted use, permissions and local requirements with the municipality; modular construction does not automatically remove permission requirements.
Plan ground assessment, foundations or supports, anchoring and drainage suited to the site and loads.
Assess the delivery route, clearances, crane access and lifting area before quoting transport.
Allow for electricity, water supply, wastewater and winter protection; site works are quoted separately.
Lead time, availability, warranties, transport, lifting and installation are set out in the contractual offer.
S40
Tell us the location and intended use to receive a tailored proposal.